How to better carry out wiring in network comprehensive computer room

Through some simple planning and preliminary work, you can maximize the efficiency and reliability of wiring. The complete plan, system planning and implementation, plus appropriate line adjustments, coupled with corresponding auxiliary equipment and tools, with these skills, construction personnel can better wire the equipment room, and management personnel can more easily Information for maintenance.
1. Reasonable design is conducive to wiring
2. If the worker wants to do his best, he must first sharpen his weapon
3. Choose the appropriate wiring
4. The cables are neat and orderly, with classified labels
5. The jumper cable should not be too long
6. After setting the line, test
7. The color of the wiring is uniform
8. Keep the cable cool

Full Hydraulic Open-air Integrated DTH Drilling Rig

This type is open-are intergrated DTH rig works with Air Compressor accords to the DTH machine different air pressure and air consumption,actually they're also named DTH Drilling Rig,it's used to different site such as ore quarry site drilling,mining site,rock drilling site,salt mine blasting site,gold ore and hematite ore site,copper ore plant construction,mineral one-stop service construction.

Moreover, one quality DTH drilling rig and reasonable spare parts as well as drilling bits requires a quality brand and reliable manufacturer,just as same as us due we're a leading manufacturer!

Separated Drilling Rig,Open-Air Integrated Rig,Ore Blasting Drilling Rig,Automatic Top Hammer Surface Drill Rig

Henan YK Prospecting Machinery Co., Ltd , https://www.yydthdrillingrig.com