National water flow metering station successfully passed metering authorization

On July 16, 2011, it was the day that the national water flow metering station met the requirements for metering authorization and supervision, and it was also the unveiling ceremony for the completion of the new gate of the National Water Surveying Station. The national water flow metering station invited Chen Chuanling, dean of the Henan Academy of Metrology, Zhan Zhijie, Director of the Zhejiang Institute of Metrology, Wang Youquan, Director of Metrology Division of Henan Province Quality and Technology Supervision Bureau, and Chairman Lin Fucheng of Kaifeng Instrument Co., Ltd. to attend the unveiling ceremony.

In June of this year, after receiving the “Circular on Supervision, Inspection and Metrological Authorization Evaluation of National Water Circulation Flow Measurement Stations”, the National Water Circulation Measurement Station received high attention from the leaders of the station and immediately organized related personnel to study the documents and understand the supervision and inspection. The essence and key points of the measurement and authorization assessment are carefully carried out. Self-inspection and rectification are carried out. The self-examination and rectification can basically meet the following requirements: development has planning, execution has goals, behavior has rules, management has system, mass transmission is guaranteed, implementation has standards, and development has The requirements for support have fully prepared for the inspection and assessment.

On July 16th and 17th, the appraisal team strictly followed the "Measures for the Supervision and Administration of Legal Metrological Verification Organizations", the "Supervisory Inspection Program for the Metrological Supervision Institutions in 2011", the "Supervisory Inspection Rules", the "Measures for the Management of Special Metrological Stations," and the "Statutory Measurements." "Accrediting agency assessment specifications" requirements, in a serious and serious, fair and just, scientific and objective, and focus on practical principles, the station to carry out the assessment of measurement authorization and supervision and inspection on-site assessment. The appraisal team reviewed the management system documents, reviewed the measurement standards and instrument equipment technical files, personnel technical files, internal audit and management review materials, complaints processing records, conducted on-site testing, on-site questions, with the top management, technical responsible person, quality Responsible person interviews and other methods systematically examined system construction, capacity building, behavior standards, and data certificates. The assessment team believes that the station has taken active and effective measures in terms of development goals, capacity building, customer service, cultural development, team building, etc. over the past five years. It has invested a lot of capital for basic construction, and has conducted technology on some measurement standards and laboratories. The transformation, beautification of the environment, met the requirements for metrological verification of environmental facilities, and improved the technical capacity for metrological verification. After two days of intense and busy examination and inspection, the national water flow metering station successfully passed the measurement authorization examination and supervision and inspection.

Spiral Bevel Gear

Spiral Bevel Gear,Heavy-duty Truck Gear,Engieering Machinery Gear

Conveyor sprocket Co., Ltd. , http://www.transmissionsprocket.com