New member of MTR Artcraft: "Creating a No. 1" Shield machine successfully accepted

On July 16th, the author was informed that China Railway Second Engineering Co., Ltd. carried out factory acceptance of the "Chuangchuang No. 1" shield machine. The members of the acceptance team reviewed the technical data, inspections, equipment lists, and product qualification certificates submitted by the company and confirmed that the inspection, production, assembly, electrical hydraulics, and quality inspections of the shield machine were accurate and accurate. The overall shield machine was Meet the site operation requirements.

地铁神器新成员:“开创一号” 盾构机顺利验收
New member of MTR Artcraft: "Creating a No. 1" Shield machine successfully accepted

Afterwards, the acceptance components were the host, the back-end, and the main control room. The three groups accepted the various components of the equipment according to the items listed in the acceptance outline. Throughout the acceptance process, the detailed operation parameters of shields, cutter heads, screw conveyors, belt conveyors, security systems, and communication and lighting systems were compared, and the individual parts were installed in separate and linked systems to meet the acceptance requirements. The shield machine has also undergone a full-scale test run, which is normal and meets the design requirements.

After one day's work, the two parties signed a memorandum of acceptance for the factory, which signified that the "Creation One" shield machine successfully passed the inspection and acceptance, and also indicated that the shield machine had reached the factory conditions.

The "Creating One" shield machine fully considered the geological conditions of the construction area during design, and was equipped with a cutter head with a small aperture ratio. The cutter head was designed with six ribs, which is more robust and durable when facing a hard location. The tool has also been reconfigured, and design adjustments are more conducive to the excavation of the shield machine.

Related news: Shield machine Machinery market

Construction Hoist Part

Construction hoist is vertical transport machinery driving by pinion and rack, mainly used on construction site for transportation of personal and materials. As a permanent or sub-permanent external elevator, it also applies to store house, dock, high tower, high chimney, etc.

There are single cage and double cages hoist. According to the need gets rid of one cage of double cages the hoist will be changed to single cage hoist. SC Construction Hoist is equipped with reliable electrical and mechanical safety device. It is efficient and safety vertical transporting equipment.


Spare parts for a construction hoist may include:

1. Wire Rope: These are used to lift and lower the load in the hoist. They may need to be replaced if they become worn or damaged.

2. Construction Hoist Motor: The motors in the hoist are responsible for powering the lifting and lowering mechanism. Spare motors may be needed in case of motor failure.

3. Electromagnet Brake: The hoist is equipped with brakes to hold the load in place. Spare brake pads or other brake components may be necessary for maintenance or repair.

4. Control panels: The control panel is used to operate the hoist and control its movements. Spare control panels or control panel components may be required in case of malfunction.

5. Safety devices: Construction hoists are equipped with various safety devices, such as limit switches, overload protection, and emergency stop buttons. Spare safety devices may be needed to ensure the hoist operates safely.

6. Bearings and bushings: These components help reduce friction and facilitate smooth movement in the hoist. Spare bearings and bushings may be necessary for maintenance or repair.

7. Electrical components: Various electrical components, such as relays, switches, and fuses, may need to be replaced if they fail or become damaged.

8. Pulleys and sheaves: These components are used to guide and redirect the wire ropes in the hoist. Spare pulleys and sheaves may be required if they become worn or damaged.

9. Hooks and shackles: The hooks and shackles are used to attach the load to the hoist. Spare hooks and shackles may be needed if they become worn or damaged.

10. Construction Hoist Steel Structure parts: Spare structural components, such as beams or mast sections, may be required for repair or replacement if they become damaged or worn over time.



Construction Hoist Parts,Passenger Hoist Rope Pulley,Construction Hoist Roller,Electromagnet Brake,Spare Parts Counter Roller

SHEN YANG BAOQUAN BUSINESS CO., LTD , https://www.sytoplesstowercrane.com